The project consisted of the
construction of a 27,300 sf triangular-shaped aircraft hangar
consisting of structural steel columns, with clear-spanning, field
erected structural steel trusses, steel joists, and metal roof deck,
with pre-finished metal wall and roof panels. The hangar door was 43
feet high and retracted to provide a 201 foot clear opening for the
aircraft. In the center of the hangar door there was a fuselage
aperture for closure around the tail of the aircraft.