This project consisted of two
structures, a 39,435 sf laboratory building that included toxic and
non-toxic lab wings as well as an administrative area, and a 3,800 sf
large filter test facility. The laboratory rooms included extensive lab
casework and fume hoods with specialty gas piping systems. The exhaust
from the laboratories was run through specialized ductwork and through
custom fabricated toxic air filters prior to discharge into the
atmosphere.